Manufacturing Leadership
Lean leadership behaviors, daily management, and culture.
- 8 guides, each free to read
- About 2 hours of reading
- 40 knowledge-check questions, with a plan
Knowledge checks, progress and the completion record come with any plan, from $5 a month. See plans
What the track covers
What a leader does every day in a lean operation: the behaviors, the routines that make them repeatable, the boards and meetings that run the day, and the culture work behind continuous improvement and safety.
The run, 8 stops. Read a guide to the end and it gets a boot print on this map. Pass its knowledge check and it gets the X.
Every guide in the list is free to read on its own. The track puts them in order and adds a check after each one.
What a plan adds
- A 5-question knowledge check after each guide, with the reasoning shown for every answer
- Guides unlock in order: score 4 of 5 to open the next one
- Progress saved to your email, so you can pick up on another computer
- A completion record with a verification link you can share
- Every other learning track and the advanced knowledge checks
Plans start at $5 a month and include the offline tools in their tier. Compare plans
Who it is for
- Production managers, area managers and plant leaders
- Supervisors stepping up to manage other supervisors
- CI leads who coach leaders
How the track works
- Read the guide. It is the same free guide anyone can open.
- Take the 5-question knowledge check at the end of it.
- Score 4 or more to mark the guide done and open the next one. Missed questions show the right answer and why.
- Finish all 8 guides to get the completion record.
Try a sample question
What is leader standard work?
- AStandard work written by leaders
- BA defined daily/weekly/monthly checklist of leadership activities that makes good leadership repeatable and auditable
- CWork assigned by leaders to teams
- DLeadership training curriculum
Show the answer
B. Just as operators have standard work for consistent production, leaders need standard work for consistent leadership: what to check, when, where, how often.
From the check after Leader Standard Work.
Other learning tracks
- The Process Architect's Blueprint16 guides. Aerospace manufacturing systems, from theory to production ramp.
- Lean Foundations14 guides. From getting started to takt, cycle time and lead time.
- Lean Master Practitioner20 guides. Four modules, from foundations to leadership.
- IE Methods & Tools17 guides. The core industrial engineering toolkit.
- Quality & Measurement7 guides. OEE, SPC, process capability, and measurement systems.
- Equipment & Maintenance5 guides. TPM, autonomous maintenance, and equipment reliability.
- All learning tracks16 tracks, from lean basics to earned value