Planning & Strategy
S&OP, scheduling, capacity, KPIs, and strategic planning.
- 12 guides, each free to read
- About 2.5 hours of reading
- 60 knowledge-check questions, with a plan
Knowledge checks, progress and the completion record come with any plan, from $5 a month. See plans
What the track covers
How a plant plans from the monthly S&OP down to the shift schedule, checks capacity, deploys strategy, manages inventory and suppliers, and measures the result in operational and financial terms.
The run, 12 stops. Read a guide to the end and it gets a boot print on this map. Pass its knowledge check and it gets the X.
- Start 1 S&OP (Sales & Operations Planning) 15 min
- 2 Production Scheduling 14 min
- 3 Capacity Planning 14 min
- Checkpoint 4 Hoshin Kanri (Strategy Deployment) 15 min
- 5 Inventory Management 13 min
- 6 Manufacturing KPIs (SQDCM) 13 min
- 7 Financial Metrics for Operations 14 min
- Checkpoint 8 Supplier Management 13 min
- 9 Lean Warehousing 12 min
- 10 Crisis Management 14 min
- 11 Lean Accounting 13 min
- Boss: the record 12 Sustainability & Green Manufacturing 14 min
Every guide in the list is free to read on its own. The track puts them in order and adds a check after each one.
What a plan adds
- A 5-question knowledge check after each guide, with the reasoning shown for every answer
- Guides unlock in order: score 4 of 5 to open the next one
- Progress saved to your email, so you can pick up on another computer
- A completion record with a verification link you can share
- Every other learning track and the advanced knowledge checks
Plans start at $5 a month and include the offline tools in their tier. Compare plans
Who it is for
- Production planners, schedulers and materials managers
- Operations managers who own the plan and the KPIs
- Engineers moving into planning or operations management
How the track works
- Read the guide. It is the same free guide anyone can open.
- Take the 5-question knowledge check at the end of it.
- Score 4 or more to mark the guide done and open the next one. Missed questions show the right answer and why.
- Finish all 12 guides to get the completion record.
Try a sample question
What is the scheduling hierarchy?
- ARandom assignment
- BS&OP (months) → Master Production Schedule (weeks) → Detailed Schedule (days/shifts) → Dispatch (hours)
- COne schedule for everything
- DTop-down only
Show the answer
B. Each level adds detail: S&OP sets direction, MPS translates to weekly product mix, detailed schedule sequences operations, dispatch assigns work to machines/operators.
From the check after Production Scheduling.
Other learning tracks
- The Process Architect's Blueprint16 guides. Aerospace manufacturing systems, from theory to production ramp.
- Lean Foundations14 guides. From getting started to takt, cycle time and lead time.
- Lean Master Practitioner20 guides. Four modules, from foundations to leadership.
- IE Methods & Tools17 guides. The core industrial engineering toolkit.
- Quality & Measurement7 guides. OEE, SPC, process capability, and measurement systems.
- Equipment & Maintenance5 guides. TPM, autonomous maintenance, and equipment reliability.
- All learning tracks16 tracks, from lean basics to earned value