Project Management
CPM, PERT, EVM, risk, and portfolio management.
- 13 guides, each free to read
- About 3 hours of reading
- 65 knowledge-check questions, with a plan
Knowledge checks, progress and the completion record come with any plan, from $5 a month. See plans
What the track covers
Scheduling and controlling engineering and capital projects: build the network and find the critical path, estimate under uncertainty with PERT and Monte Carlo, buffer with critical chain, structure the work, measure it with earned value, and manage risk, scope, stakeholders and the portfolio.
The run, 13 stops. Read a guide to the end and it gets a boot print on this map. Pass its knowledge check and it gets the X.
- Start 1 Critical Path Method (CPM) 14 min
- 2 PERT 14 min
- 3 Critical Chain (CCPM) 15 min
- Checkpoint 4 DAGs in Scheduling 13 min
- 5 Work Breakdown Structure 13 min
- 6 Gantt Charts 12 min
- 7 Earned Value Management 15 min
- Checkpoint 8 Resource Leveling & Smoothing 14 min
- 9 Project Risk Management 14 min
- 10 Scope Management 13 min
- 11 Monte Carlo Simulation 15 min
- Checkpoint 12 Project Portfolio Management 14 min
- Boss: the record 13 Stakeholder Management 13 min
Every guide in the list is free to read on its own. The track puts them in order and adds a check after each one.
What a plan adds
- A 5-question knowledge check after each guide, with the reasoning shown for every answer
- Guides unlock in order: score 4 of 5 to open the next one
- Progress saved to your email, so you can pick up on another computer
- A completion record with a verification link you can share
- Every other learning track and the advanced knowledge checks
Plans start at $5 a month and include the offline tools in their tier. Compare plans
Who it is for
- Engineers running capital, line move or new product projects
- Project coordinators and PMO staff in manufacturing
- Leads preparing for project management certification
How the track works
- Read the guide. It is the same free guide anyone can open.
- Take the 5-question knowledge check at the end of it.
- Score 4 or more to mark the guide done and open the next one. Missed questions show the right answer and why.
- Finish all 13 guides to get the completion record.
Try a sample question
What is the key difference between CPM and PERT?
- AThey are the same
- BCPM uses single-point estimates; PERT uses three-point estimates (optimistic, most likely, pessimistic) to account for uncertainty
- CPERT is newer
- DCPM is for construction only
Show the answer
B. PERT acknowledges uncertainty: each task has O (best case), M (most likely), P (worst case). The expected time = (O + 4M + P) / 6.
From the check after PERT.
Other learning tracks
- The Process Architect's Blueprint16 guides. Aerospace manufacturing systems, from theory to production ramp.
- Lean Foundations14 guides. From getting started to takt, cycle time and lead time.
- Lean Master Practitioner20 guides. Four modules, from foundations to leadership.
- IE Methods & Tools17 guides. The core industrial engineering toolkit.
- Quality & Measurement7 guides. OEE, SPC, process capability, and measurement systems.
- Equipment & Maintenance5 guides. TPM, autonomous maintenance, and equipment reliability.
- All learning tracks16 tracks, from lean basics to earned value