Supervisor Development
From first 90 days through performance management and compliance.
- 12 guides, each free to read
- About 2.5 hours of reading
- 60 knowledge-check questions, with a plan
Knowledge checks, progress and the completion record come with any plan, from $5 a month. See plans
What the track covers
The practical skills of running a shift: settling in, training people the TWI way, building a flexible crew, solving problems at the line, handing over a shift, handling conflict and meetings, onboarding, managing up, performance and OSHA basics.
The run, 12 stops. Read a guide to the end and it gets a boot print on this map. Pass its knowledge check and it gets the X.
- Start 1 New Supervisor: First 90 Days 15 min
- 2 Training Within Industry (TWI) 14 min
- 3 Cross-Training & Flexibility 13 min
- Checkpoint 4 Problem Solving for Supervisors 12 min
- 5 Shift Handoff Best Practices 11 min
- 6 Ergonomics in Manufacturing 13 min
- 7 Conflict Resolution 14 min
- Checkpoint 8 Running Effective Meetings 12 min
- 9 Onboarding New Operators 13 min
- 10 Managing Up 12 min
- 11 Performance Management 14 min
- Boss: the record 12 OSHA & Regulatory Compliance 15 min
Every guide in the list is free to read on its own. The track puts them in order and adds a check after each one.
What a plan adds
- A 5-question knowledge check after each guide, with the reasoning shown for every answer
- Guides unlock in order: score 4 of 5 to open the next one
- Progress saved to your email, so you can pick up on another computer
- A completion record with a verification link you can share
- Every other learning track and the advanced knowledge checks
Plans start at $5 a month and include the offline tools in their tier. Compare plans
Who it is for
- New and promoted production supervisors and team leads
- Operators preparing for a lead role
- Managers building a supervisor training plan
How the track works
- Read the guide. It is the same free guide anyone can open.
- Take the 5-question knowledge check at the end of it.
- Score 4 or more to mark the guide done and open the next one. Missed questions show the right answer and why.
- Finish all 12 guides to get the completion record.
Try a sample question
What are the 4 steps of TWI Job Instruction?
- ATell, Show, Do, Review
- BPrepare the learner, Present the operation, Try out performance, Follow up
- CRead, Watch, Practice, Test
- DLecture, Demo, Lab, Exam
Show the answer
B. Prepare → Present → Try Out → Follow Up. The learner must verbalize key points and reasons during Try Out to prove comprehension.
From the check after Training Within Industry (TWI).
Other learning tracks
- The Process Architect's Blueprint16 guides. Aerospace manufacturing systems, from theory to production ramp.
- Lean Foundations14 guides. From getting started to takt, cycle time and lead time.
- Lean Master Practitioner20 guides. Four modules, from foundations to leadership.
- IE Methods & Tools17 guides. The core industrial engineering toolkit.
- Quality & Measurement7 guides. OEE, SPC, process capability, and measurement systems.
- Equipment & Maintenance5 guides. TPM, autonomous maintenance, and equipment reliability.
- All learning tracks16 tracks, from lean basics to earned value