What's New in Line Designer Pro

Every release of Line Designer Pro on this site, newest first: what is new, what changed and what you get.

  1. Line Designer Pro 1.5.3

    Fixes to capacity, pace and rebalancing so every tab gives the same answer.

    What's New

    • A wait on a station over the pace gets its own note: remove the wait, since moving it does not help.

    What Changed

    • Capacity rounds down, never up: 106.6 a day reads 106.
    • Rebalancing never moves a waiting element. It stays at its station and takes its time out of that station.
    • When Quick's totals come from the stations in Design, Quick judges the stations as built, as Design does.
    • One pace on every tab, with downtime taken out.

    What You Get

    • The same verdict on Quick and Design for the same line.