What's New in Website
Every release of Website on this site, newest first: what is new, what changed and what you get.
-
Website
The modelers lead the home page, a new /modelers page says which one to pick, and the Floor Simulator has a 2-day trial.
What's New
- The /modelers page: which modeler fits a production line, a staffing flow, or a high-mix or repair shop, with the store's side-by-side rows.
- A 2-day free trial of the Floor Simulator, emailed from its store page.
- This changelog: every release of every tool on one page, with a filter by tool.
What Changed
- The home page opens with the Floor Simulator's One Page and a button to try it free for 2 days.
- Under the hero, a card each for Floor Simulator, Process Modeler and Mixed Shop Modeler, with its screen, the question it answers, its plan and its one-time price.
- The Tools menu opens with Modelers, its three tools and a line each.
- The Floor Simulator store page shows the one-time $249 buy beside the plan.
What You Get
- One page to pick a modeler from before you open a store page.
- A way to try the Floor Simulator before you buy it.
- What changed in each tool, and when, in one place.