What's New in Line Design Quick Checks

Every release of Line Design Quick Checks on this site, newest first: what is new, what changed and what you get.

  1. Line Design Quick Checks 1.5.3

    Capacity and pace read the same way on every check.

    What's New

    None in this release.

    What Changed

    • Capacity rounds down, never up: 106.6 a day reads 106.
    • One pace on every check: the running hours with the stopped hours taken out, as Takt and Line does.

    What You Get

    • Checks that agree with each other on the same numbers.