Enterprise Systems & Technology
ERP, MES, PLM, Industry 4.0, IIoT, and data analytics.
- 11 guides, each free to read
- About 2.5 hours of reading
- 55 knowledge-check questions, with a plan
Knowledge checks, progress and the completion record come with any plan, from $5 a month. See plans
What the track covers
The software and automation layer of a plant: what ERP, MES and PLM each do and where they hand off, how scheduling logic works, and where Industry 4.0, connected devices, robotics, analytics and simulation fit.
The run, 11 stops. Read a guide to the end and it gets a boot print on this map. Pass its knowledge check and it gets the X.
- Start 1 ERP Systems 15 min
- 2 MES Systems 14 min
- 3 PLM Systems 14 min
- Checkpoint 4 Business Intelligence 14 min
- 5 Forward vs Backward Scheduling 13 min
- 6 Production Systems Ecosystem 15 min
- 7 Industry 4.0 & Smart Manufacturing 16 min
- Checkpoint 8 IIoT & Device Integration 15 min
- 9 Robotics & Automation 14 min
- 10 Data Analytics for Operations 14 min
- Boss: the record 11 Simulation & Process Modeling 15 min
Every guide in the list is free to read on its own. The track puts them in order and adds a check after each one.
What a plan adds
- A 5-question knowledge check after each guide, with the reasoning shown for every answer
- Guides unlock in order: score 4 of 5 to open the next one
- Progress saved to your email, so you can pick up on another computer
- A completion record with a verification link you can share
- Every other learning track and the advanced knowledge checks
Plans start at $5 a month and include the offline tools in their tier. Compare plans
Who it is for
- Engineers joining an ERP or MES rollout
- Operations and IT staff who connect the floor to the business systems
- Managers choosing where to invest in automation and data
How the track works
- Read the guide. It is the same free guide anyone can open.
- Take the 5-question knowledge check at the end of it.
- Score 4 or more to mark the guide done and open the next one. Missed questions show the right answer and why.
- Finish all 11 guides to get the completion record.
Try a sample question
What is MRP logic in an ERP system?
- AMaterial Recycling Process
- BMaterial Requirements Planning: exploding the BOM against demand to calculate what materials to order, how many, and when
- CMachine Resource Planning
- DManufacturing Review Process
Show the answer
B. MRP takes the master schedule + BOM + inventory status and calculates net requirements: what to buy/make, quantities, and timing.
From the check after ERP Systems.
Other learning tracks
- The Process Architect's Blueprint16 guides. Aerospace manufacturing systems, from theory to production ramp.
- Lean Foundations14 guides. From getting started to takt, cycle time and lead time.
- Lean Master Practitioner20 guides. Four modules, from foundations to leadership.
- IE Methods & Tools17 guides. The core industrial engineering toolkit.
- Quality & Measurement7 guides. OEE, SPC, process capability, and measurement systems.
- Equipment & Maintenance5 guides. TPM, autonomous maintenance, and equipment reliability.
- All learning tracks16 tracks, from lean basics to earned value