Control Account Management

CAM responsibilities, planning, and performance measurement.

  • 8 guides, each free to read
  • About 2 hours of reading
  • 40 knowledge-check questions, with a plan
Start the track Read guide 1 free

Knowledge checks, progress and the completion record come with any plan, from $5 a month. See plans

WBS × OBS

What the track covers

What a control account manager owns and does each month: plan work packages, hold the budget baseline, measure performance, explain variances, estimate the work left, and handle change without breaking the baseline.

The run, 8 stops. Read a guide to the end and it gets a boot print on this map. Pass its knowledge check and it gets the X.

Every guide in the list is free to read on its own. The track puts them in order and adds a check after each one.

What a plan adds

  • A 5-question knowledge check after each guide, with the reasoning shown for every answer
  • Guides unlock in order: score 4 of 5 to open the next one
  • Progress saved to your email, so you can pick up on another computer
  • A completion record with a verification link you can share
  • Every other learning track and the advanced knowledge checks
Start the track

Plans start at $5 a month and include the offline tools in their tier. Compare plans

Who it is for

  • New and current control account managers (CAMs)
  • Engineering and production leads given a control account
  • Program control staff who support CAMs

How the track works

  1. Read the guide. It is the same free guide anyone can open.
  2. Take the 5-question knowledge check at the end of it.
  3. Score 4 or more to mark the guide done and open the next one. Missed questions show the right answer and why.
  4. Finish all 8 guides to get the completion record.

Try a sample question

What is the difference between a work package and a planning package?

  1. AThey are the same thing
  2. BA work package has detail planning (budget, schedule, EV technique); a planning package has budget but detail planning is deferred to a future date
  3. CWork packages are for production; planning packages are for engineering
  4. DPlanning packages are larger
Show the answer

B. Planning packages hold budget for future work not yet detailed enough to plan at the work package level. They must be converted to work packages before work begins (rolling wave planning).

From the check after Work Package Planning.