EVMS Reporting
Earned Value Management for aerospace programs.
- 8 guides, each free to read
- About 2.5 hours of reading
- 40 knowledge-check questions, with a plan
Knowledge checks, progress and the completion record come with any plan, from $5 a month. See plans
What the track covers
Earned value management as it is run on aerospace and defense programs: the guidelines, the WBS, the core metrics and indices, variance analysis and reporting, estimates at completion, the integrated baseline review, and the monthly program report.
The run, 8 stops. Read a guide to the end and it gets a boot print on this map. Pass its knowledge check and it gets the X.
- Start 1 EVMS Fundamentals 18 min
- 2 Work Breakdown Structure (WBS) 16 min
- 3 Earned Value Metrics 20 min
- Checkpoint 4 CPI & SPI Analysis 17 min
- 5 Variance Analysis & Reporting 16 min
- 6 Estimate at Completion Methods 18 min
- 7 Integrated Baseline Review (IBR) 15 min
- Boss: the record 8 Monthly CPR/IPMR Generation 17 min
Every guide in the list is free to read on its own. The track puts them in order and adds a check after each one.
What a plan adds
- A 5-question knowledge check after each guide, with the reasoning shown for every answer
- Guides unlock in order: score 4 of 5 to open the next one
- Progress saved to your email, so you can pick up on another computer
- A completion record with a verification link you can share
- Every other learning track and the advanced knowledge checks
Plans start at $5 a month and include the offline tools in their tier. Compare plans
Who it is for
- Program control analysts and cost/schedule engineers
- Control account managers who report earned value
- Engineers joining a program that runs an EVMS
How the track works
- Read the guide. It is the same free guide anyone can open.
- Take the 5-question knowledge check at the end of it.
- Score 4 or more to mark the guide done and open the next one. Missed questions show the right answer and why.
- Finish all 8 guides to get the completion record.
Try a sample question
What is the 100% rule in WBS?
- A100% of budget must be allocated
- BThe WBS must capture 100% of program scope: no more, no less. Children must sum to 100% of parent.
- C100% of work must be done on time
- DAll 100 team members must be assigned
Show the answer
B. Every child must account for 100% of its parent. If scope exists outside the WBS, it has no budget. If scope overlaps, budget is double-counted.
From the check after Work Breakdown Structure (WBS).
Other learning tracks
- The Process Architect's Blueprint16 guides. Aerospace manufacturing systems, from theory to production ramp.
- Lean Foundations14 guides. From getting started to takt, cycle time and lead time.
- Lean Master Practitioner20 guides. Four modules, from foundations to leadership.
- IE Methods & Tools17 guides. The core industrial engineering toolkit.
- Quality & Measurement7 guides. OEE, SPC, process capability, and measurement systems.
- Equipment & Maintenance5 guides. TPM, autonomous maintenance, and equipment reliability.
- All learning tracks16 tracks, from lean basics to earned value